CCMPO
CCMPO
  > CCMPO Home     > Freight, Rail, & Trucking Library  
 


CHITTENDEN COUNTY REGIONAL FREIGHT STUDY ~ FINAL REPORT

Prepared for: Chittenden County Metropolitan Planning Organization,

Prepared by: Cambridge Systematics, Inc.,
with: Parsons, Brinckerhoff, Fitzgerald, & Halliday, Inc.
August 2001


COVER

EXECUTIVE SUMMARY

TABLE OF CONTENTS

CHAPTER 1: Introduction

CHAPTER 2: Project Approach

CHAPTER 3: County Freight Profile

CHAPTER 4: Commodity Flows and Logistics Patterns

CHAPTER 5: Evaluate the Feasibility of Operating Intermodal Facilities

CHAPTER 6: Findings, Conclusions, and Recommendations

APPENDIX A: Literature Review

APPENDIX B: Documentation of Reebie Data

APPENDIX C: Survey Instruments

APPENDIX D: Interview Participants

APPENDIX E: Methodology for Evaluating Freight Transportation Projects

APPENDIX F: Data Needs and Methodology for a Modal Diversion Analysis

APPENDIX G: Glossary


Download entire report (10.8 mB *.pdf)


You may need Adobe® Acrobat® to view these documents: